Residents of Pattabiram are calling for a limited-use subway beneath the newly opened six-lane Rail Over Bridge. Although one carriageway opened in September 2024, locals claim there is no provision for slow-moving traffic to safely cross the Level Crossing No. 2 railway siding.

Residents of Pattabiram are calling for a limited-use subway beneath the newly opened six-lane Rail Over Bridge. Although one carriageway opened in September 2024, locals claim there is no provision for slow-moving traffic to safely cross the Level Crossing No. 2 railway siding.